Skip to main content
2 July 2025

Assembly underway for new boat hoist

The slipway has been a focal point of activity in recent weeks, with the assembly of our new Cimolai travel lift now well underway.

The assembly of the boat hoist is part of a significant infrastructure upgrade to the slipway operation at Port Nelson.

The Boat Hoist will allow the lifting of vessels from 50 to 550 tonnes onto a hardstand, leaving the slipway free to service larger vessels up to 2400 tonnes.

Delivered in several large components, the assembly began with the careful on-site construction of the steel framework, assisted by two heavy cranes.

Given the size and complexity of the lift, the process has required meticulous coordination between our internal teams and external contractors. The next stage will see the installation of the engine and hydraulic systems.

Following assembly, the boat hoist will remain offline until redevelopment works at the slipway are complete. Once operational, the new boat hoist will greatly enhance our lifting capacity and operational flexibility, supporting a wide range of vessels from commercial operators to private boat owners.

Click here to read the full RE:PORT